2021 Phase 3
2021 Phase 3 started with the connection of all the first floor bedrooms it continued with two new ensuites and the refurbishment of the groundfloor washroom and ended with the refurbishment of the Lounge
2021 Phase 3 started with the connection of all the first floor bedrooms it continued with two new ensuites and the refurbishment of the groundfloor washroom and ended with the refurbishment of the Lounge